Methodology

The project is divided in seven Work Packages, two dealing with the management of the project and the dissemination of its results (WP1,WP7), and the remaining five dealing with the technical content (WP2-WP6). The project flowchart and the interrelation between the WPs is shown in Figure 3. Below we discuss in detail the methodology that will be followed with respect to the WPs of the project.

Figure 3. Flowchart of the project methodology